A mold is made by shaping a suitable sand mixture around a pattern of the desired form. A metal or wood box (flask) is used to retain the sand. The pattern is then removed from the sand, leaving a cavity in the sand into which the molten metal can be poured. The molder's skill is the basic skill of the foundry.
Analyzing the moulding cost in CO2 (sand casting process) involves evaluating the various components involved in the moulding stage of the production process. In CO2 moulding, a mixture of sand and sodium silicate is used, with carbon dioxide gas introduced to harden the mould. To perform a cost analysis for this process, you need to break down the costs into different categories and evaluate their impact on the total moulding cost.
Here’s how you can analyze the moulding cost in CO2:
1. Identify Major Cost Components
Moulding costs in CO2 casting typically involve several cost elements. You should first identify and categorize them:
Raw Material Costs: This includes the cost of the sand, sodium silicate, and any other materials required for the process (e.g., additives or binders).
Sand: CO2 sand casting typically uses green sand (silica sand mixed with water and clay) or synthetic sand. The amount of sand used per mould must be calculated based on the part's size and complexity.
Sodium Silicate: The binder used for the sand mixture.
CO2 Gas Costs: The cost of CO2 gas used to harden the sand mould. The volume of CO2 required is linked to the size of the mould and the time needed for the gas to solidify the sand.
Labor Costs: Labor involved in preparing, mixing, and handling the sand, and the associated costs for workers involved in the moulding process. Labor costs can vary based on the level of automation and the complexity of the moulding operation.
Energy Costs: The energy required for heating or curing the sand and for any equipment used in the moulding process. This includes the operation of gas mixers, CO2 injectors, and any furnaces or ovens used to heat the sand mixture.
Equipment Costs: Depreciation or maintenance costs for the equipment used in the CO2 moulding process, such as sand mixers, CO2 injectors, and moulding machines.
Waste and Scrap Costs: CO2 casting can generate waste, such as scrap metal or faulty moulds that don’t meet the quality standards. These costs should be accounted for in the analysis.
Transportation Costs: If sand or any other raw material needs to be transported to the foundry, these costs must be factored in.
2. Track and Measure Material Usage
Sand Consumption: Measure how much sand is consumed per casting or per batch. This will depend on the part size, complexity, and moulding method.
Formula: Sand cost per unit = Sand consumption per mould × Cost of sand per kg
Sodium Silicate Consumption: Calculate the amount of sodium silicate used per casting. This can be based on a known ratio of binder to sand (e.g., 1% of the total sand weight).
Formula: Sodium silicate cost = Sodium silicate used per mould × Cost per unit of sodium silicate.
CO2 Usage: Monitor the amount of CO2 used per mould. You will need to know how much gas is required per casting based on its size and thickness.
Formula: CO2 gas cost = Volume of CO2 used × Cost per unit of CO2.
3. Labor and Equipment Cost Allocation
Labor Cost: Track how many workers are involved and the amount of time spent on the moulding process. This could include the number of operators and technicians, as well as supervisors and support staff.
Formula: Labor cost per unit = (Number of labor hours per casting × Hourly wage) / Number of castings produced per day.
Equipment Depreciation: Calculate the depreciation cost of moulding equipment, such as CO2 sand mixers, CO2 injectors, and moulding machines. This cost is spread over the number of castings produced.
Formula: Equipment cost per unit = (Annual equipment cost / Total number of castings produced in a year).
4. Waste and Scrap Analysis
Identify Defects: Keep track of defective castings and how much scrap is generated during the process. The percentage of defects should be monitored to understand the efficiency of the process and the associated costs of scrap.
Formula: Scrap cost = Defective units × Cost per defective unit.
Reducing Scrap: Investigate ways to reduce scrap and defects, which will lower the overall cost. This could involve improving the moulding technique, optimizing the sand mix, or ensuring better CO2 gas distribution.
5. Energy Consumption
Energy Costs: Track energy use related to heating the sand mixture or the curing process for the moulds. This may involve the use of electric heating or gas burners in some foundries.
Formula: Energy cost per unit = (Energy used per casting × Cost of energy per unit).
6. Analyze the Data
Once you’ve collected the data for all cost components, you can perform a cost breakdown analysis. Summarize each cost element and calculate the total cost per casting.
Example:
Sand cost: 20 kg per mould × $0.10 per kg = $2.00
Sodium Silicate cost: 0.2 kg per mould × $2.00 per kg = $0.40
CO2 cost: 1.5 m³ per mould × $0.50 per m³ = $0.75
Labor cost: 0.5 hours per mould × $20 per hour = $10.00
Energy cost: 0.1 kWh per mould × $0.12 per kWh = $0.01
Total Moulding Cost per Unit: $13.16
7. Optimize the Process
Process Improvement: Based on your analysis, look for ways to optimize the moulding process and reduce costs. For example:
Reduce CO2 Gas Consumption: Improve the gas distribution system to reduce CO2 waste.
Optimize Sand Mix: Adjust the sand-to-binder ratio to reduce material costs without compromising quality.
Improve Labor Productivity: Introduce automation or better training to reduce labor hours.
Energy Efficiency: Implement energy-saving technologies or optimize furnace operations to reduce energy costs.
Track the Effectiveness: Once optimizations are implemented, continue tracking costs to measure their impact and ensure you are achieving cost reductions.
8. Cost Benchmarking
Compare the moulding costs against industry standards or competitors to see if your process is in line with best practices. Benchmarking helps identify areas where you might be overspending.
---
Conclusion
Analyzing moulding costs in CO2 casting requires a thorough breakdown of all the costs involved: raw materials (sand, sodium silicate), CO2 gas, labor, energy, equipment, and waste. By measuring and tracking these components, you can calculate the total cost per unit and identify opportunities for optimization. With this data, you can improve the cost-effectiveness of the CO2 moulding process, reduce waste, and ultimately increase profitability.